![GB50403-2007炼钢机械设备工程安装验收规范(英文版)](https://wfqqreader-1252317822.image.myqcloud.com/cover/829/33688829/b_33688829.jpg)
上QQ阅读APP看本书,新人免费读10天
设备和账号都新为新人
5 Installation of Converter
5.1 General Requirements
5.1.1 This chapter shall be applicable to the quality acceptance for the installation of converter with the nominal capacity of 100-300t.
5.1.1 This chapter shall be applicable to the quality acceptance for the installation of converter with the nominal capacity of 100-300t.